Kitchen Remodeling in Los Angeles

Looking for a kitchen remodel in Los Angeles? Girl Flip Construction is a licensed, women-led general contractor (California license #1091248) that designs, permits and builds kitchen remodels across Los Angeles and the San Fernando Valley. You get one crew, one project manager and one written price, from the first layout sketch to the final walkthrough. Most kitchen remodels take about 10 to 16 weeks, depending on permits and cabinet lead times.

5.0 average rating · Licensed CA contractor #1091248

Quick Answer

What does a kitchen remodel in Los Angeles include?

A full kitchen remodel with Girl Flip covers the layout, cabinets, counters, backsplash, flooring, lighting, plumbing, electrical and appliance hookups, plus permits when your plan needs them. Most projects run about 10 to 16 weeks from signed contract to final walkthrough. It is built for homeowners who want one licensed crew from the first sketch to the reveal. If you are comparing kitchen remodeling companies in Los Angeles, ask each one who manages permits and who is on site every day. We answer both before you sign.

Why Girl Flip

A women-led kitchen remodeler Los Angeles homeowners can call by name

Girl Flip is a licensed, women-led, family-owned kitchen remodeling company. Erica Anenberg, our general contractor and founder, and Beth Benson, our head of sales and operations, stay on your project from the first walkthrough to the last one. You never get handed to a rotating cast of estimators.

Kitchens are what we do best. For Carnie Wilson, we gutted a 400-square-foot kitchen down to the studs, refinished and reconfigured the cabinets to fit a 72-inch built-in refrigerator, and took out a wall to open a passthrough to the dining room. We also built two kitchens that appeared on HGTV with Tarek El Moussa, in Torrance and Long Beach.

Our shop is in Canoga Park, so the crew, the materials and the project managers are close to the work. We hold CA contractor license #1091248 and carry a 5.0 rating across Google, Yelp, Sitejabber, ProvenExpert and BuildZoom.

What We Build

Kitchen remodeling services, from layout to the last cabinet pull

Every kitchen renovation in Los Angeles is scoped in writing after a walkthrough, so you know what is included before work starts. Here is what that scope usually covers.

01

Kitchen layout and design

We rework the floor plan so the kitchen cooks, stores and gathers the way your family really lives. That can mean a bigger island, a cleaner work triangle, or opening the wall to the family room.

02

Custom and semi-custom cabinets

Cabinets are built or ordered to fit your walls, your storage habits and your budget. We can also refinish and reconfigure good existing boxes, as we did in the Carnie Wilson kitchen.

Explore →
03

Countertops

Quartz, granite and natural stone are templated after the cabinets are set, then installed clean. We help you weigh edge profiles, seams and upkeep before you commit.

Explore →
04

Kitchen islands

A custom kitchen island can hold prep space, seating, a sink or a range. We size it to the room so you can still open the dishwasher and walk behind a stool.

Explore →
05

Backsplash and tile

From stacked ceramic to full-height marble slab, we set tile flat and finish it cleanly around outlets, windows and hood runs.

Explore →
06

Flooring

Wide-plank hardwood, engineered wood and tile all work in a kitchen, and we run the new floor through the open living space so the seams do not show.

Explore →
07

Appliances and ventilation

Gas ranges, built-in refrigerators and larger hoods change the venting, gas line and electrical load. We confirm the specs before the cabinets are ordered.

Explore →
08

Lighting and electrical

Recessed lights, under-cabinet lighting and pendants go in on planned circuits, with added outlets where you will use them.

Planning a kitchen renovation in Los Angeles? Tell us about your space and we will set up a discovery call.

Our Process

How a Los Angeles kitchen remodeling company runs your project, step by step

A clear order of work is what keeps a kitchen remodel from running your life. These are the five steps, with the time each one usually takes from our kitchen timeline guide.

1

Discovery call

A short call to hear about your goals, your timeline and your budget, and to see if we are a fit for each other.

2

Walkthrough and quote

We walk the kitchen, measure, take photos and write a detailed scope and estimate. Design and material selections usually take 2 to 4 weeks.

3

Plans and permits

Drawings, engineering and permit paperwork for anything that moves plumbing, electrical or walls. Permit review runs 2 to 8 weeks or more, depending on the city.

4

Build

Demo takes 2 to 5 days. Rough-in, drywall, cabinets, counters and finish work follow, usually over several weeks, with regular updates from the crew.

5

Reveal

A final walkthrough with a punch list, so every detail is right before we call it done.

Cost at a Glance

Kitchen Remodel Cost in Los Angeles at a Glance

Every kitchen is different, but these starting prices give you a realistic idea of where a Los Angeles kitchen remodel begins. All pricing includes labor and construction materials only. Finishes are determined by your selections.

Type of remodelWhat it usually includesTypical range
Cosmetic refreshCosmetic updates to the existing kitchen.Starting at $50,000
Full remodelA complete remodel of the kitchen.Starting at $200,000
Custom remodelA fully custom kitchen designed around your home and how you cook.Up to $450,000

Finishes such as cabinets, counters, tile and fixtures are determined by your selections, so the final number depends on what you choose. A free discovery call is the fastest way to get a number for your actual kitchen.

Cost and Timeline

How much does kitchen remodeling cost in Los Angeles?

Kitchen remodels in Los Angeles start at $50,000 for a cosmetic refresh and $200,000 for a full remodel, and custom remodels can reach $450,000. A full project usually takes about 10 to 16 weeks from signed contract to final walkthrough. Pricing includes labor and construction materials only, and finishes are determined by your selections. These are starting prices, not a quote. The number for your home comes after a walkthrough.

What changes the price

  • Layout changes. Moving a sink, a range or a wall adds plumbing, electrical and sometimes structural work.
  • Cabinet type. Custom, semi-custom and refinished cabinets can swing a budget by tens of thousands of dollars.
  • Counter material and appliance package. A quartz counter with standard appliances costs far less than a slab island with built-ins.
  • What is behind the walls. Older Los Angeles homes often turn up outdated panels, galvanized pipe or unpermitted prior work once the walls open.

Affordable kitchen renovation in LA: where to save

An affordable kitchen renovation in LA usually keeps the layout, because moving plumbing, gas lines and walls is where budgets jump. We lay out the options on the walkthrough so you spend where it shows.

  • Keep the footprint. Leaving the sink, range and walls in place avoids the biggest cost swings.
  • Refinish or reface sound cabinets. Good boxes can look new without a full replacement.
  • Pick counters and appliances early. Standard sizes and in-stock materials avoid rush fees and long waits.
Materials and Options

Cabinets, counters and layouts: the choices that shape your kitchen

Lead times drive the schedule more than demolition does. Custom cabinets, certain stone slabs and specialty appliances can take weeks to arrive, so we help you finalize selections and order early.

In a Spanish bungalow or a mid-century ranch, a kitchen remodel often means opening a closed kitchen to the dining room and rebalancing storage. In a tract home in the Valley, the footprint is usually fixed, so the gains come from smarter cabinet runs and a better island or peninsula. A mid-century kitchen remodel can keep the clean lines of flat-panel cabinets while swapping in better counters, lighting and appliances.

Changing a selection after materials are ordered is the most common cause of delay. We lock decisions before demo and price each upgrade clearly, so you can trade one for another.

Permits

Do you need a permit for a kitchen remodel in Los Angeles?

In the City of Los Angeles, moving walls, relocating plumbing, adding circuits or changing a gas line generally needs a permit from LADBS, the Los Angeles Department of Building and Safety. Swapping cabinets and counters in place often does not. Cities such as Burbank, Beverly Hills and Calabasas run their own building departments with their own rules. Altadena is unincorporated, so permits there come from LA County, which we cover on our page about kitchen remodeling in Altadena. Sherman Oaks is inside the City of Los Angeles, so it is an LADBS job, as described in kitchen remodeling in Sherman Oaks. Planning more than the kitchen? See how we run a whole house remodel in Los Angeles.

We tell you which category your plan falls into. When a permit applies, our preconstruction package takes the project to Ready to Issue, which includes plans, structural engineering where needed, energy compliance documents and permit processing. Read the details in our guide on whether you need a permit to remodel in California.

Timeline

Kitchen Remodel Timeline in Los Angeles

Homeowners often ask how long they will be without a kitchen. Here is a typical timeline for a full kitchen remodel with us. Most kitchen remodels take about 10 to 16 weeks. The steps usually run in this order:

  1. Design, measurements, selections, and a written scope and price.
  2. Permit submission and plan review. We order cabinets and long-lead items during this time so nothing sits and waits.
  3. Demolition and rough-in work for plumbing, electrical and gas.
  4. Drywall, flooring and cabinet installation.
  5. Countertops, backsplash, lighting, plumbing fixtures and appliances.
  6. Final inspection, punch list and walkthrough.

Permit timing changes by city, and special-order cabinets can add time. We share the real schedule before we start, not after.

Areas We Serve

Kitchen remodeling near you across Los Angeles and the Valley

We remodel kitchens across the city of Los Angeles and the San Fernando Valley, and we have dedicated pages for the neighborhoods and cities below.

Featured Projects

Kitchen renovation projects in Los Angeles we are proud of

Photos show the finish quality better than any description. These are real Girl Flip kitchens.

Reviews

What Los Angeles homeowners say about working with us

Rated a perfect 5.0 across Google, Yelp, Sitejabber, ProvenExpert and BuildZoom.

★★★★★
From start to finish the entire Girl Flip team provided excellent work, thoughtful attention to detail, and impeccable customer service. Our home has been completely transformed.
AlexisFull Home Renovation
★★★★★
The team at Girl Flip made remodeling our home and recording studio such a fun and pleasant experience. Looking at the before-and-after photos still blows my mind!
Kim CavalloFull Home and Studio Remodel
★★★★★
We had a great consultation with Beth and Erica. They came prepared, took detailed notes and photos, and spent time understanding every aspect of our project. They were transparent about costs and potential challenges, and we left feeling informed about our options and next steps. Highly recommend!
Veronica GrijalvaRemodel Consultation
Good Questions

Kitchen remodeling Los Angeles FAQs

How much does kitchen remodeling cost in Los Angeles?
Kitchen remodels in Los Angeles start at $50,000 for a cosmetic refresh and $200,000 for a full remodel, and custom remodels can reach $450,000. Pricing includes labor and construction materials only, and finishes are determined by your selections. Layout changes, cabinet type, counters, appliances and what is found behind the walls drive the number. We give you a real range after a walkthrough.
How long does a kitchen remodel take?
Plan on about 10 to 16 weeks from signed contract to final walkthrough. Design and selections take 2 to 4 weeks, permits 2 to 8 weeks or more, and construction several weeks after that. Finalizing choices before demo is the best way to protect your schedule.
Do I need a permit for a kitchen remodel in Los Angeles?
Usually yes if you move walls, relocate plumbing, add circuits or change a gas line. In the City of Los Angeles that permit comes from LADBS. Swapping cabinets and counters in place often needs none. We tell you which applies and handle the permit when it does.
What is the process of hiring a kitchen remodeling contractor?
You start with a discovery call, then a walkthrough, a written scope and estimate, plans and permits, the build and a final reveal. At every step you deal with the same team, so decisions and changes do not get lost.
How do I choose a kitchen remodeling contractor in LA?
Check that the contractor is licensed with the CSLB, ask to see finished kitchens, and ask who will actually be on site. Girl Flip is licensed (CA #1091248), women-led, and shows real project photos. Compare written scopes, not just totals.
What should I look for in a kitchen remodeling company in Los Angeles?
Look for an active CSLB license, a written scope, finished kitchens you can see and one team that handles permits and inspections. Girl Flip is licensed (CA #1091248), women-led and keeps you with the same team from walkthrough to final reveal. Compare scopes line by line, not only totals.
How do I find the best kitchen remodeling contractors in Los Angeles?
Start with the CSLB license lookup, then read reviews on more than one site and ask each contractor for recent local kitchens. Girl Flip is rated 5.0 across Google, Yelp, Sitejabber, ProvenExpert and BuildZoom, and our work has been featured on HGTV. Call two or three and compare how clearly each explains the scope.
What is the difference between a kitchen remodel and a kitchen renovation?
Homeowners use the two terms for the same kind of work. A kitchen renovation in Los Angeles usually means updating cabinets, counters, flooring and fixtures, while a remodel can also change the layout. We scope both the same way, in writing, after a walkthrough.
How can I do an affordable kitchen renovation in LA?
Keep the layout, since moving plumbing, gas and walls adds the most cost. Refacing or refinishing sound cabinets, choosing quartz over a slab and ordering appliances early all help. We lay out these options on the walkthrough so you can spend where it matters.
Who are the LA kitchen remodel experts at Girl Flip?
Erica Anenberg, our general contractor and founder, and Beth Benson, our head of sales and operations, run every kitchen project. Kitchens are our specialty, and our work has been featured on HGTV. You deal with the same people from the first walkthrough to the final reveal.
Can you move walls or change the kitchen layout?
Yes. Opening a kitchen to the family room or dining room is one of the most common requests. If the wall is load-bearing, we bring in structural engineering and pull a permit. We check the wall during the walkthrough so you know early.
Can I stay home during my kitchen remodel?
Most clients do. We set up a temporary kitchen area, seal off the work zone with dust barriers and clean up every day. The loudest and messiest weeks are demolition and cabinet installation.
Why choose a women-led kitchen remodeler?
Our clients tell us they feel heard. Erica and Beth run every project, communicate often and explain costs plainly. The work is done by a licensed crew, with the same attention to detail you see in our HGTV kitchens.
Do you remodel kitchens in Studio City, Encino and Beverly Hills?
Yes. We serve Studio City, Encino, Beverly Hills, Tarzana, Woodland Hills, Sherman Oaks and the rest of Los Angeles and the Valley. We also work in Thousand Oaks, Calabasas, Westlake Village and Agoura Hills. See the area links above for each page.
How do I choose a kitchen remodeler in Los Angeles?
Check three things: an active California contractor license (you can verify ours, #1091248, on the CSLB website), a written scope with a fixed price, and recent projects in your area. Ask to speak with past clients. A good contractor will happily give you names.
Is it cheaper to keep my kitchen layout or move things around?
Keeping the layout is almost always cheaper. Moving sinks, gas lines or the stove adds plumbing, electrical and sometimes structural work. If your layout works, put the budget into better cabinets and counters instead.
Do you handle the permits for a kitchen remodel?
Yes. We prepare the drawings, submit the permit application and schedule the inspections. You do not need to visit the building department.
Guides

Related guides

Read more before you plan your project.

Let's flip your space!

Tell us about your project and we'll set up a discovery call to talk it through. Serving LA and the Valley.