Bathroom remodel with scalloped tile and an alcove tub
Remodeling · Los Angeles & The Valley

Whole House Remodeling in Los Angeles

A full home remodel means one team runs the entire project: design, permits, demolition, framing, plumbing, electrical, finishes and the final walkthrough. Girl Flip Construction is a licensed, women-led general contractor (California license #1091248) that handles whole home remodels, complete renovations and full gut remodels across Los Angeles and the San Fernando Valley. You deal with one crew, one schedule and one written price instead of juggling five different contractors.

5.0 average rating · Licensed CA contractor #1091248

Our Approach

Full Home Remodeling, done the Girl Flip way

A whole house remodel is the one project where the contractor you pick matters more than the finishes you pick. One team runs the whole job: the design, the permits, the demolition, the framing, the plumbing and electrical, the finishes and the final walkthrough. Girl Flip Construction is a licensed, women-led, family-owned general contractor in Canoga Park (California license #1091248). We handle whole house remodels, full gut renovations and complete home renovations across Los Angeles and the San Fernando Valley.

What's Included

What we handle

01

Whole-Home Design

A cohesive plan so every room works together, not in isolation.

02

Gut Renovations

Down-to-the-studs renovations done in the right order.

03

Kitchens & Baths

Your highest-impact rooms, handled by the team that specializes in them.

04

Flooring & Paint

Consistent flooring and paint that tie the whole home together.

05

Project Management

One point of contact and steady updates from start to finish.

06

Permits & Coordination

We coordinate trades and permitting so the job stays on track.

Remodel or Renovation

Whole Home Remodel vs. Full Gut Renovation: What Is the Difference?

These terms get mixed up, so here is how we use them.

A whole home remodel updates most or all rooms in the house. The walls and layout mostly stay, while kitchens, bathrooms, floors, paint, lighting and finishes are replaced.

A full gut renovation strips the home down to the studs. We replace old plumbing, electrical and drywall, and we can move walls, open up the floor plan and add insulation. This is the right choice for older homes with outdated systems.

A complete home renovation can include both. Some rooms get a refresh, others get a full gut. We walk through your house and tell you which rooms need which level of work, so you do not pay for a gut remodel where a refresh will do.

Cost

What a Whole House Remodel Costs in Los Angeles

There is no honest single price for a whole house remodel, because two houses of the same size can cost very different amounts depending on what is behind the walls. What we can tell you is what the pieces cost, because those are the numbers we quote every week. Our kitchen remodels start around $50,000 for a cosmetic refresh and around $200,000 for a full remodel with layout changes. Fully custom kitchens can reach $450,000. Bathroom remodels start around $40,000. Those prices cover labor and construction materials. Cabinets, counters, tile and fixtures are priced separately, because that is where your taste, and your budget, comes in. A whole house project is those rooms plus everything between them: electrical panel and wiring, plumbing lines, structural changes, flooring, paint, doors and windows. The biggest swings come from three places: how much we have to open up, whether walls move, and the finishes you select. After a site visit we give you a written, line-by-line estimate so you can see where every dollar goes before you sign.

Timeline

How Long Does a Whole House Remodel Take?

A full home remodel with Girl Flip typically takes 8 to 12 months. Design and permits come first, then construction, and homes with additions or structural work can take longer. We share a written schedule before we start and keep you updated as the project moves.

Process

Our Whole Home Remodeling Process

  1. Discovery call. We talk through your goals, budget and timeline. It is free.
  2. Walkthrough and measurements. We visit your home and check what is behind the walls where possible.
  3. Design and selections. We help you choose layouts, cabinets, tile, flooring, fixtures and paint.
  4. Written scope and price. You see every line item before you sign.
  5. Permits. We prepare plans, submit them and respond to city comments.
  6. Construction. A project manager is on site, sends weekly updates and handles every inspection.
  7. Final walkthrough. We walk every room with you, fix the punch list and hand over your home.
Living at Home

Can We Live in the House During a Whole Home Remodel?

For a full gut or a project that touches the kitchen and every bathroom, most families move out for part or all of the build. For phased remodels, some clients stay and we work room by room, keeping one bathroom and a temporary kitchen available. We will tell you which option is realistic for your home before you sign.

Permits

Permits for a Whole Home Remodel in Los Angeles

A whole house remodel almost always needs permits, because it usually involves electrical, plumbing and sometimes structural work. In the City of Los Angeles, permits go through the Department of Building and Safety (LADBS). Other cities such as Beverly Hills, Calabasas and Thousand Oaks have their own building departments, and Altadena is handled by Los Angeles County. We prepare the plans, file the permits and manage the inspections for you. Which office issues your permit depends on your address. Homes in the City of Los Angeles, including Sherman Oaks and Encino, go through LADBS. Unincorporated areas such as Altadena go through LA County Public Works. Cities like Calabasas, Beverly Hills and West Hollywood have their own building departments. We pull the permit from the right office for your address.

Hiring

How to choose a whole house remodeler

Are they licensed for this work? You can look up any California contractor on the Contractors State License Board website with the license number. Ours is #1091248.

Will you get a written scope and a line-item estimate before work starts? If a contractor gives you one number on a napkin, ask what is in it and what is not.

Who is your day-to-day contact? On a job that runs for months, you want one person who knows your house.

How do they handle surprises? Every older house has them. Ask how changes are priced and approved in writing before work continues.

Does the contract match California rules? State law limits what a contractor can ask for as a down payment on a home improvement contract, and the Contractors State License Board publishes the current rules.

Recent Work

See our work

Plan Your Project

Helpful guides

Whole-home remodeling near you

Good Questions

Full Home Remodeling FAQs

Do you handle permits for a full-home remodel?
Yes, we coordinate the permitting and inspections your project requires so everything is done legally and to code.
Can we stay in the home during the remodel?
Sometimes, depending on scope. For larger gut renovations many clients move out for part of the work. We will talk through what makes sense for your project.
How do you keep a big project on schedule?
One accountable crew, a clear sequence of work, and honest communication. When something comes up, we bring you a solution and a cost, not a surprise.
What is the difference between a remodel and a renovation?
In everyday use they mean almost the same thing. Remodeling usually means changing the layout or look of a space. Renovation usually means restoring or updating what is already there. Many whole house projects include both.
Do I need an architect for a full home remodel?
Not always. If the project changes walls, adds square footage or alters the structure, you will need drawings and sometimes an engineer. We coordinate designers and engineers so you do not have to hire each one separately.
Can you remodel just part of my house?
Yes. Many clients start with a kitchen and two bathrooms, then add rooms later. We plan the work so each phase fits with the next one.
How do you keep a whole home remodel on budget?
We price every line item up front, set aside a contingency for surprises behind the walls, and require written approval before any change. You always know what the total is.
Do you offer financing?
We do not offer financing directly. If you arrange your own loan, we are happy to provide the written scope and estimate your lender asks for.
How much does a whole house remodel cost in Los Angeles?
It depends on the size of the house, how much gets opened up and the finishes you pick, so we do not quote one number without a site visit. For reference, our kitchen remodels start around $50,000 and $200,000, and bathrooms around $40,000, for labor and construction materials. You get a line-by-line written estimate after the walkthrough.
How do I check a contractor's license before a whole house remodel?
Search the California Contractors State License Board website using the license number. Ours is #1091248. Check that the license is active and that the name on it matches the name on your contract.
How long does a whole house remodel take in Los Angeles?
Most take 8 to 12 months. Design and permits come first, then construction, and additions or structural work can take longer. We share a written schedule before we start.
Guides

Related guides

Read more before you plan your project.

Local pages

Where we do this

Whole-home remodels are a big part of our work in the Valley and in Glendale. Local pages cover full home remodeling in Tarzana, West Hills, whole-home remodels in Woodland Hills and Glendale.

Let's flip your space!

Tell us about your project and we'll set up a discovery call to talk it through. Serving LA and the Valley.

• 7751 Alabama Ave #11, Canoga Park, CA 91304

Your info is kept private and never shared.
Call (818) 303-4083Free Discovery Call