There is no honest single price for a whole house remodel. Here is how the number gets built, and what we can say for certain.
Short answer: nobody can give you an honest single price for a whole house remodel in Los Angeles without seeing the house. The cost depends on the size of the home, how much of it we gut, and the finishes you choose. What we can do is show you how the number gets built, where the money goes, and the starting prices we do publish for kitchens and bathrooms.
A whole home remodel updates most or all rooms in the house. The walls and layout mostly stay, while kitchens, bathrooms, floors, paint, lighting and finishes are replaced. A full gut renovation goes further and strips the home to the studs so old plumbing, electrical and drywall can be replaced and walls can move. Many projects are a mix: some rooms get a refresh and others get a full gut. Our full home remodeling page explains the difference in more detail.
We add up the parts. The biggest parts are almost always the kitchen and the bathrooms, so those come first.
| Part of the project | What it covers | How it affects the price |
|---|---|---|
| Kitchen | Cabinets, counters, appliances hookups, lighting, plumbing, electrical | Starts at $50,000 for a cosmetic refresh, $200,000 for a full remodel and $450,000 for a custom kitchen |
| Each bathroom | Tile, waterproofing, vanity, fixtures, shower or tub | Bathroom remodels start at $40,000 |
| Structural changes | Moving or removing walls, new openings, beams | Needs an engineer, plans and a permit, so it adds design and permit cost as well as construction |
| Systems | Electrical panel, plumbing lines, heating and cooling | Older Los Angeles homes often turn up outdated panels or galvanized pipe once the walls open |
| Floors, doors, windows, paint | Whole house finishes | Scales with square footage and your selections |
| Plans and permits | Drawings, engineering, energy compliance, permit processing | Required for most whole house projects |
All pricing includes labor and construction materials only. Finishes are determined by your selections. Starting prices are where a project begins, not a quote. The number for your home comes after a walkthrough.
A full home remodel with Girl Flip typically takes 8 to 12 months. Design and permits come first, then construction, and homes with additions or structural work can take longer. For a room by room view of the schedule, see our kitchen remodel timeline guide and our process page.
For HGTV with Tarek El Moussa, we took a Long Beach house through a full gut remodel with an addition, then built two new detached ADUs on the same property. Projects like that show why a line by line estimate matters: every part of the scope has its own cost, and a good contractor lets you see each one. Closer to home, our full home remodeling in Tarzana, Woodland Hills and West Hills pages cover what whole house projects look like in those neighborhoods.
We do not quote a per square foot number, because it hides the things that move the price most: kitchens, bathrooms, structural work and your finishes. We price a whole home line by line after a site visit.
Often it is more efficient. One crew, one schedule and one permit package mean less repeated setup, protection and cleanup than separate projects spread over several years. The right answer depends on your home and your budget.
We do not offer financing directly. If you arrange your own loan, we can provide the written scope and estimate your lender asks for.
Planning a whole house remodel? See our full home remodeling in Los Angeles page, or our local pages for Tarzana and Woodland Hills.
Want a real number and schedule for your project? Schedule a discovery call →, or read our kitchen & bathroom remodel cost guide.
Tell us about your project and we'll set up a discovery call to talk it through. Serving LA and the Valley.