Four clear steps, honest communication, and a crew that treats your home like their own.
We start with a free phone call to hear about your project, goals, timeline, and budget, and see if we are the right fit. No pressure, no cost, just a real conversation.
If it is a fit, we start with a free virtual call to dive deeper into your scope, then move to an in-person consultation where our team walks your space and puts together a detailed, accurate estimate. Unlike a quick ballpark, this is a thorough process: real numbers, material guidance, and no mystery line items, so you know exactly what you are getting before we build. The onsite consultation fee is credited toward your project if you move forward with us.
Our crew gets to work with steady updates and solution-oriented problem solving. When something comes up, we bring you a fix and a cost.
The walkthrough where you finally see your new space, and we make sure every detail is right before we call it done.
The four steps above are the outline. Here is what each one means for you, week to week.
The discovery call is about fit. We ask about your goals, your timeline and your budget, and you ask us anything. If it makes sense, a virtual call goes deeper into the scope, and then we walk your space in person. After the walkthrough you get a written scope and estimate that lists what is included, so you can compare it with any other bid line by line.
Once you sign, design and selections come first: layout, cabinets, tile, counters, fixtures and finishes. Finalizing choices before demolition is the best way to protect the schedule, because custom cabinets, stone and specialty appliances can take weeks to arrive. If your plan needs a permit, we prepare the plans and submit them. Review times depend on the city and how busy the office is, so we give you a range rather than a promise we cannot control.
During construction you get steady updates, not silence. We tell you what is happening this week, what comes next and what we need from you. When something comes up behind a wall, such as old plumbing, outdated wiring or prior unpermitted work, we bring you a fix and a cost before work continues. Change orders are written down, so the final number never surprises you.
At the end we walk the finished space with you, check every door, drawer, fixture and finish, and write down anything that needs a touch-up. We fix that list before we call the project done. Questions about warranties, care and maintenance get answered at this walkthrough too.
| Project | Typical timeline | What drives it |
|---|---|---|
| Kitchen remodel | About 10 to 16 weeks from signed contract to final walkthrough | Design, selections, cabinet and appliance lead times, permits |
| Bathroom remodel | About 5 to 10 weeks | Tile choices, layout changes, waterproofing |
| Full home remodel | About 8 to 12 months | Size of the home, how much is gutted, permits, selections |
| ADU or garage conversion | Design and permit review first, then construction. We give a schedule after the site walk | City review times, utilities, site conditions |
Planning a specific project? See our kitchen remodeling, bathroom remodeling and ADU construction pages, or read our kitchen remodel timeline guide.
Tell us about your project and we'll set up a discovery call to talk it through. Serving LA and the Valley.