Example ADU by Girl Flip with white shaker cabinets, a gas range and a patio door
ADU Construction · Studio City

ADU Construction in Studio City

Girl Flip designs, permits and builds ADUs for Studio City homeowners, including detached units in deep back yards and garage conversions on flat lots near CBS Studio Center.

5.0 average rating · Licensed CA contractor #1091248

ADUs in Studio City

ADU construction in Studio City, for family, guests or rental income

Studio City is a good place for an ADU. Many lots in the flats are deeper than they look from the street, and many homes have a detached garage at the back. Homeowners ask us for a guest house, a space for a parent, a home office or a rental that helps cover the mortgage.

We are an ADU builder in Studio City that handles design, engineering, permits and construction as one job. You do not have to coordinate an architect, an engineer and a builder on your own. Erica Anenberg and Beth Benson stay on your project from the first walkthrough to the final inspection.

Girl Flip is a licensed, women-led, family-owned general contractor, and we built two detached ADUs side by side for HGTV in Long Beach. We know what it takes to build a small unit that lives like a real home.

What We Build

What a Studio City ADU project includes

Every Studio City ADU is scoped in writing after a site walk. These are the types and tasks we plan most often here.

01

Detached ADUs

A standalone unit in the back yard, with its own foundation, roof and utility connections. Deeper flat lots often have the space.

Explore →
02

Garage conversions

Turning a detached garage into a living unit is usually the most affordable path, since the structure already exists.

Explore →
03

Full kitchens and bathrooms

Every ADU needs a working kitchen and bath. We size cabinets, appliances and fixtures to a smaller footprint without making it feel cramped.

Explore →
04

Plans, engineering and permits

Plans, structural engineering, Title 24 energy compliance and permit processing, handled for you.

05

Utility connections

Power, water, sewer and gas, sized and routed for the new unit. In Los Angeles, power and water come from LADWP.

06

Privacy and site planning

Separate entries, fencing and landscaping so the main house and the ADU each keep their space.

Local Considerations

Permits, hillsides and utilities in Studio City

Studio City is part of the City of Los Angeles, so ADU permits come from LADBS. Every ADU needs its own permit set, structural review and energy compliance documents before construction starts. State law sets a 60-day review clock for a complete application, and we prepare the package to avoid delays.

Lots toward Fryman Canyon and the hillside streets can fall under Los Angeles hillside rules, which affect size, grading and access. We check the rules for your address on the site walk, before you spend anything on drawings.

On flat lots near CBS Studio Center, the main questions are usually setbacks, the location of existing utilities and how equipment reaches the back yard. We plan access, staging and noise so the project stays livable for you and your neighbors.

Thinking about an ADU in Studio City? Tell us about your lot and we will set up a discovery call.

Process and Timeline

How a Studio City ADU project runs, in short

An ADU starts with a discovery call and a site walk, then a written scope and estimate. Next come plans, structural engineering and Title 24 energy compliance, followed by permit submission. Review times vary by city and by how busy the department is. Construction follows, with site work, foundation or slab, framing, utilities, inspections and finishes, and it ends with a final inspection and walkthrough. We give you a schedule after the site walk and tell you what could change it.

Neighborhoods and Zips

Where we work in Studio City

We take ADU projects across Studio City and the neighboring streets.

Neighborhoods

  • The flats near CBS Studio Center. Flat lots with detached garages and room for a back-yard ADU.
  • Colfax Meadows. Residential streets of 1940s and 1950s homes, many with deep rear yards.
  • Fryman Canyon and the hillside streets. Sloped lots where hillside rules and access shape the design.
  • Valley Village border. Homes along the Studio City and Valley Village line, in the 91607 zip code.

Zip codes we serve

If your Studio City address falls in one of these zip codes, we can take on your ADU. Not sure? Call us and we will confirm.

  • 91604 (Studio City)
  • 91607 (Valley Village and nearby)
Featured Work

ADU work you can judge for yourself

For HGTV with Tarek El Moussa in Long Beach, we built two brand-new detached, side-by-side ADUs from the ground up. It was a rare, complex project that required precise coordination across both structures.

The photos below show finished ADU interiors from our portfolio.

Cost Context

ADU cost in Studio City

Garage conversions in Los Angeles commonly run from the high $70Ks into the $150K range, and new detached ADUs commonly start around $150K. These are general market ranges, not a quote. Lot conditions, utility runs and finish level move the number most. Our ADU cost guide covers each type.

On a Studio City lot, the biggest cost drivers are the utility run to the back of the property, the slope and the finish level. A site walk tells you more than a floor plan can.

Nearby Areas

Nearby areas and related pages

Close to Studio City, we also build ADUs in these areas.

Local and Close By

A Studio City ADU team within easy reach

Studio City is an easy drive east along the 101 from our Canoga Park shop. We are licensed (CA #1091248), women-led and family-owned, and we are glad to come out for a site walk.

Good Questions

Studio City ADU construction FAQs

How do I choose an ADU builder in Studio City?
Check the CSLB license, ask to see finished ADUs, and ask who manages permits and inspections. Girl Flip is licensed (CA #1091248), women-led and handles design, permits and construction together, so you deal with one team.
Do I need a permit to build an ADU in Studio City?
Yes. Studio City is part of the City of Los Angeles, so the permit comes from LADBS. Every ADU needs its own permit set, structural review and energy compliance documents. State law sets a 60-day review clock for a complete application.
Can I build an ADU on a hillside lot in Studio City?
Often, yes, but hillside rules can affect size, grading and access. We check the rules for your address on the site walk, before you spend money on drawings.
Can I convert my Studio City garage into an ADU?
In most cases, yes. State law allows garage conversions, and a conversion is usually the most affordable ADU path. The condition of the slab, the framing and the panel decide the scope, so we inspect them first.
How much does an ADU cost in Studio City?
Garage conversions in Los Angeles commonly run from the high $70Ks into the $150K range, and new detached ADUs commonly start around $150K. Lot conditions, utility runs and finishes drive the number. We price your lot after a site walk.
How long does it take to build an ADU in Studio City?
Plan for design and permit review first, then construction. LADBS review times vary with workload, and garage conversions generally move faster than detached builds. We give you a schedule after the site walk.

Let's flip your space!

Tell us about your project and we'll set up a discovery call to talk it through. Serving LA and the Valley.

• 7751 Alabama Ave #11, Canoga Park, CA 91304

Your info is kept private and never shared.
Call (818) 303-4083Free Discovery Call